| Understand the Contents of Projects and Construction methods. |
| Allocation of work to teams. |
| To attend daily morning meeting for planning and review. |
| To check work completed by teams as per drawings. |
| To guide and control teams working with him. |
| To check and prepare Material for Installation in advance. |
| To provide and ensure proper utilization of Tools and Tackles |
| To provide and ensure proper utilization of consumables. |
| Unpacking / Checking for damage and Shifting of Material from storage yard area to actual installation location inside Shop as required. |
| To ensure Safe working conditions before starting work. |
| Understand the Drawing and Layout for installation at Job Site. |
| Understand the systems & Procedures of work at Job Site. |
| Daily / Weekly work planning with required Tools and Tackles. |
| Ensuring the availability of material in the sub assembly form. |
| Ensure regular usage of safety gears for self as well as workmen. |
| Confirm Daily KYT at allotted location. (Safety Oath) |
| To follow all instructions given by seniors / Job Site in charge / Manager. |
| Ensure the availability of Safety gears in allotted areas of Job Site. |
| Precise Installation of final product at the required location as per the Drawings / Layouts. |
| While actual installation of our Equipments / System, to take care of other workmen working in same area, Machines of Clients and other contractors / other working Staff members. (Safety / Damage to Building & Machines) |
| Preparation of Work Completion Report / Final Checking Reports. |
| Work Schedule variance Report. |
| Attendance verification of Contract Workers for cross check. |
| Submit Site Expenses Report as & when required. |
| To prepare all required detail data / report of modifications completed. |